
Material Resource Planning System :
The primary control focus of Pre-Soft MRP system is Order Entry. Once an order is entered (and it may be an internal order to build for stock), all the manufacturing functions are put into motion. These include.
Cost Estimates - a function of Order Entry. Cost builds can be ordered from information in the other modules.
Order Entry - where the demand originates. Orders may be scheduled for periodic builds
Inventory Control - do we have any of this stuff already built? How much?
Bill of Materials - what parts are needed to produce the product. BOM provides a complete multi-level build 'blow down'.
Purchasing - what parts called for by the BOM are in stock and which ones do we have to buy, and when do they have to be here.
Manufacturing Floor Control and Scheduling. Controlling allocation of personnel and resources.
Invoicing - where an order is transformed into an Invoice and shipping documents. Partial shipments and periodic shipments are allowed for, and will draw down the order quantity.
Copyright @ 2010 Premier Software All rights reserved.